RE2’s Role as a Lender’s Engineer – Wind Power

TAPAL WIND ENERGY (PVT.) LTD

Project Development of 30 MW Wind Power Project in Jhimpir, Sindh – Pakistan; the project is in construction phase. RE2 was involved in the development phase for
undertaking the feasibility study. Thereafter, RE2 together with LI entered into a lender’s engineer role for the due diligence and construction supervision. The COD was achieved in the 4th quarter of 2016.

NATIONAL BANK OF PAKISTAN

RE2 was the Lender’s Engineer for Fauji Wind Energy 2X50 MW Wind Power Projects (FWE-I & FWE-II) in Gharo, Sindh Pakistan, in partnership with Lahmeyer International. The services were provided to a consortium of banks including Asian Development Bank (ADB), Islamic Development Bank (IDB) and a consortium of local banks led by NPB. RE2 / LI were also appointed as the Owner’s Engineer along with the Lender’s Engineer whilst keeping a Chinese wall in between. RE2 provided due diligence and construction monitoring services as Lender’s Engineer for Tapal Wind Energy 30 MW Wind Power Project in Jhimpir, Sindh Pakistan, in partnership with Lahmeyer International. The services were provided to National Bank of Pakistan.

HABIB BANK LIMITED OF PAKISTAN

RE2 has been involved as Lender’s Engineer for Yunus Energy 50 MW Wind Power Project in Jhimpir, Sindh Pakistan, in partnership with Lahmeyer International. Lender’s Engineer services were provided to a consortium of banks including Habib Bank Limited of Pakistan, United Bank Limited, MCB Bank Limited, Faysal Bank Limited and Allied Bank Limited of Pakistan. RE2 / LI were also appointed as Owner’s Engineer along with the Lender’s Engineer keeping the Chinese wall in between.

INTERNATIONAL FINANCE CORPORATION (IFC)

RE2 was Lender’s Engineer for Zorlu Energy 50 MW Wind Power Project in Jhimpir, Sindh, Pakistan, in partnership with Lahmeyer International. Lender’s Engineer services are provided to a consortium of banks including IFC, Asian Development Bank (ADB) and Habib Bank Limited of Pakistan. The projects have achieved CODs. RE2 provided due diligence services as Lender’s Engineer for Metro Power 50 MW Wind Power Project in Jhimpir, Sindh Pakistan, in partnership with Lahmeyer International. The services were provided to IFC and consortium of local banks for due diligence and construction monitoring.

MASTER GREEN ENERGY LTD.

50 MW MGEL is the second Wind Power Project by Master Group (MWEL). Project Development of 50 MW Wind Power Project in Jamshoro-Sindh, Pakistan is being conducted by RE2. The involvement is full time technical support to the project. The project is currently at licensing and tariff stage. RE2 has LI’s support in the development, particularly in the wind studies.

JAMSHED WIND ENERGY PRIVATE LTD (JWEL)

The project is the third wind power project by Master Group. Project development of 50 MW Wind Power Project in Jhimpir, Sindh, Pakistan is being conducted by RE2; the project is in the development phase. The involvement is full time technical support to the project. The project is currently at licensing and tariff stage. RE2 has LI’s support in the development, particularly in the wind studies.

GUL AHMED ELECTRIC LTD (GEL).

Development of the second Wind Power Project by Gul Ahmed Energy Ltd (GAEL); GEL 50MW Wind Power Project in Jhimpir-Sindh, Pakistan is being conducted by RE2. The involvement is full time technical support to the project. The project is currently at licensing and tariff stage. RE2 has LI’s support in the development, particularly in the wind studies.

METRO WIND ENERGY LTD.

Development of 60 MW Wind Power Project in Jhimpir -Sindh, Pakistan is being conducted by RE2. It is the second Wind Power Project by Metro Energy Ltd (MEL). The involvement is full time technical support to the project. The project is currently at licensing and tariff stage. RE2 has LI’s support in the development, particularly in the wind studies.

RTISTIC WIND POWER (PVT) LTD

50 MW AWPPL is the second Wind Power Project by Artistic Milliners Ltd (AML) after Hartford. Project Development of 50 MW Wind Power Project in Jhimpir-Sindh, Pakistan is being conducted by RE2. The involvement is full time technical support to the project. The project is currently at licensing and tariff stage. RE2 has LI’s support in the development, particularly in the wind studies.

ACT – II WIND (PVT) LTD

50 MW ACT-II is the second Wind Power Project by Tapal Wind Energy Ltd (TWEL). Project Development of 50 MW ACT-II Wind (Pvt.) Ltd in Jhimpir-Sindh, Pakistan is being conducted by RE2. The involvement is full time technical support to the project. The project is currently at licensing and tariff stage. RE2 has LI’s support in the development, particularly in the wind studies.